亚洲中字幕日产AV片在线,美女福利一区二区三区,亚洲尺码电影av久久,xxxxxl日本17上线,美女毛片在线观看AV,国产精品一二二区视在线,亚洲精品国产精品乱码视色,久久久久久久久久久综合日本
查看全部
當(dāng)前位置:首頁(yè)   >    產(chǎn)品中心   >    電壓擊穿試驗(yàn)儀   >    擊穿電壓試驗(yàn)儀   >   BDJC-50KV北京擊穿電壓強(qiáng)度廠家 產(chǎn)品展示

北京擊穿電壓強(qiáng)度廠家

型 號(hào)BDJC-50KV

更新時(shí)間2024-11-21

廠商性質(zhì)生產(chǎn)廠家

報(bào)價(jià)

產(chǎn)品描述:北京擊穿電壓強(qiáng)度廠家

產(chǎn)品概述

北京擊穿電壓強(qiáng)度廠家安全說(shuō)明:

試驗(yàn)在較高電壓下進(jìn)行,所以我們?cè)谠O(shè)計(jì)時(shí)加以必要的保護(hù)措施以防止發(fā)生意外。

1.試驗(yàn)在試驗(yàn)箱中進(jìn)行,試樣可放在空氣中或變壓器油中。50KV電壓頭安全放電距離對(duì)四周均小于200mm,試驗(yàn)時(shí)即使觸到箱壁也不會(huì)發(fā)生危險(xiǎn)。

2.升壓變壓器高壓側(cè)尾端及儀器外殼是連接在一起的,即儀器外殼與該地點(diǎn)的地是等電位。

3.電路保護(hù):儀器設(shè)有過(guò)流保護(hù)、過(guò)壓保護(hù)、失壓保護(hù)、短路保護(hù)、漏電保護(hù)電路等。

 

 

 

北京擊穿電壓強(qiáng)度廠家整機(jī)組成:

1、升壓部件:由調(diào)壓器和高壓變壓器組成050KV的升壓部分。

2、動(dòng)部件:由步進(jìn)電機(jī)均勻調(diào)節(jié)調(diào)壓器使加給高壓變壓器的電壓變化。

3、檢測(cè)部件:由集成電路組成的測(cè)量電路。通過(guò)信號(hào)線把檢測(cè)的模擬信號(hào)和開(kāi)關(guān)信號(hào)傳給計(jì)算機(jī)。

4、計(jì)算機(jī)軟件:通過(guò)智能電路把由檢測(cè)設(shè)備采集的測(cè)控信號(hào)傳給計(jì)算機(jī)。計(jì)算機(jī)根據(jù)采集的信息控制設(shè)備運(yùn)行并處理試驗(yàn)結(jié)果。

5、試驗(yàn)電極:根據(jù)國(guó)家標(biāo)準(zhǔn)(1408.1-2006)隨設(shè)備提供三個(gè)電極,具體規(guī)格為:Ф25mm×25mm兩個(gè);Ф75mm×25mm一個(gè)。

 

 

 

技術(shù)指標(biāo):

01、輸入電壓: 交流 220 V

02、輸出電壓: 交流 0--50 KV ; 直流 0—50 KV

03、電器容量: 3KVA

04、高壓分級(jí): 0-10KV,0--50KV

 

 

 

安全說(shuō)明:

試驗(yàn)在較高電壓下進(jìn)行,所以我們?cè)谠O(shè)計(jì)時(shí)加以必要的保護(hù)措施以防止發(fā)生意外。

1.試驗(yàn)在試驗(yàn)箱中進(jìn)行,試樣可放在空氣中或變壓器油中。50KV電壓頭安全放電距離對(duì)四周均小于200mm,試驗(yàn)時(shí)即使觸到箱壁也不會(huì)發(fā)生危險(xiǎn)。

2.升壓變壓器高壓側(cè)尾端及儀器外殼是連接在一起的,即儀器外殼與該地點(diǎn)的地是等電位。

3.電路保護(hù):儀器設(shè)有過(guò)流保護(hù)、過(guò)壓保護(hù)、失壓保護(hù)、短路保護(hù)、漏電保護(hù)電路等。

 

 

 

整機(jī)組成:

1、升壓部件:  2、動(dòng)部件:  3、檢測(cè)部件:  4、計(jì)算機(jī)軟件: 5、試驗(yàn)電極:

 

前面板直流交流選擇按鈕。該按鈕的狀態(tài)不能改變?cè)O(shè)備輸出的電壓性質(zhì)。按下該按鈕,設(shè)備僅僅是把直流報(bào)警電路接入。指示用戶,當(dāng)打開(kāi)箱門時(shí),您需要對(duì)高壓均壓球放電。轉(zhuǎn)動(dòng)放電桿,使放電桿的端部銅球接觸高壓均壓球。建議用戶每次放電銅球接觸高壓均壓球時(shí)間大于五秒。

試驗(yàn)的交直流電壓切換,主要取決于高壓絕緣塔中的短路桿是否取出。當(dāng)取出短路桿時(shí),高壓均壓球上的電壓為直流電壓,插入短路桿時(shí),高壓均壓球上的電壓為交流電壓。短路桿的取出、插入?yún)⒖醋髠?cè)的示意圖。

在直流試驗(yàn)時(shí),計(jì)算機(jī)也要選擇直流狀態(tài),否則測(cè)的結(jié)果是不正確的。簡(jiǎn)單的說(shuō),交流電壓與直流電壓有倍的關(guān)系。

 

 

滿足標(biāo)準(zhǔn):

GB1408-2006 GB/T1695-2005 GB/T3333  HG/T3330 /GB12656 /ASTM D149 .

 

Beijing breakdown voltage strength manufacturers safety instructions:
Test is carried out at high voltage, so we need to protect the design to prevent accidents.
1 tests are carried out in the test chamber, and the samples can be placed in the air or in the transformer oil. 50KV voltage head safety discharge distance to the four sides are less than 200mm, even if the test is not dangerous to touch the wall.
2. A step-up transformer high voltage side end and the outer housing of the instrument is connected together, is the instrument shell and the place is the potential.
3 circuit protection: the instrument is equipped with over current protection, over voltage protection, voltage protection, short circuit protection, leakage protection circuit, etc..
Beijing breakdown voltage strength manufacturers machine components:
1, boost parts: by the voltage regulator and high voltage transformer to form 0 ~ 50KV of the booster section.
2, moving parts: by step motor to adjust the voltage regulator evenly to add to the high voltage transformer voltage change.
3, detection components: the integrated circuit composed of measuring circuit. Signal and switching signals are transmitted to the computer through signal lines.
4, the computer software: through the inligent circuit to the test equipment collected by the monitoring and control signals to the computer. According to the information collected by the computer to control the operation of the equipment and to deal with the results of the test.
5, the test electrode: according to the national standard (1408.1-2006) with the equipment provides three electrodes, specifications: diameter of 25mm * two; a diameter of 75mm x 25mm a.
Beijing breakdown voltage strength manufacturers technical indicators:
01, input voltage: AC 220 V
02, output voltage: AC KV 0--50; DC 0 - 50 KV
03, electrical capacity: 3KVA
04, high pressure classification: 0--50KV, 0-10KV
Beijing breakdown voltage strength manufacturers safety instructions:
Test is carried out at high voltage, so we need to protect the design to prevent accidents.
1 tests are carried out in the test chamber, and the samples can be placed in the air or in the transformer oil. 50KV voltage head safety discharge distance to the four sides are less than 200mm, even if the test is not dangerous to touch the wall.
2. A step-up transformer high voltage side end and the outer housing of the instrument is connected together, is the instrument shell and the place is the potential.
3 circuit protection: the instrument is equipped with over current protection, over voltage protection, voltage protection, short circuit protection, leakage protection circuit, etc..
Beijing breakdown voltage strength manufacturers machine components:
1, boost parts: 2, moving parts: 3, detection parts: 4, computer software: 5, the test electrode:
Front panel DC AC selection button. The state of the button can not change the nature of the output of the device. Press the button, the device is only the DC alarm circuit access. Indicating the user, when opening the door of the box, you need to discharge the high-pressure. Put the end of the rotation pole, copper ball contact high-pressure discharge pole equalizing ball. Suggest that the user each time the discharge copper ball contact high pressure average pressure ball time is more than five seconds.
Test of AC and DC voltage switching, mainly depends on the high voltage insulation tower in the short circuit rod is removed. When the short circuit rod is taken out, the voltage on the high voltage average pressure ball is DC voltage, and the voltage of the high voltage average pressure ball is the voltage of the AC voltage when the short circuit rod is inserted. The drawing of the short circuit rod, and the sketch map of the left.
In the DC test, the computer should also choose the DC state, otherwise the test results are not correct. Simply said, the relationship between the AC voltage and DC voltage.
Beijing breakdown voltage strength manufacturers meet the standards:
GB/T1695-2005 GB/T3333 HG/T3330 /GB12656 /ASTM D149. GB1408-2006

留言框

  • 產(chǎn)品:

  • 您的單位:

  • 您的姓名:

  • 聯(lián)系電話:

  • 常用郵箱:

  • 省份:

  • 詳細(xì)地址:

  • 補(bǔ)充說(shuō)明:

  • 驗(yàn)證碼:

    請(qǐng)輸入計(jì)算結(jié)果(填寫阿拉伯?dāng)?shù)字),如:三加四=7
聯(lián)系人:陳丹
手機(jī):
18911395947
點(diǎn)擊這里給我發(fā)消息
 
主站蜘蛛池模板: 无码人妻精品一区二区| 午夜中文在线| 丰满的少妇xxxxx青青青| 羞羞麻豆国产精品1区2区3区 | 国产成人8x人网站在线视频| 日本久久久亚洲精品| 午夜寂寞视频无码专区| 女性女同性aⅴ免费观女性恋| 东方av天堂| 一区二区三区A片| 久久中文字幕日本| av中文字幕在线观看网站| 亚洲精品久久久久中文字幕二区 | 日本亚洲精品无码专区| 色鬼7777久久| 日本无码人妻精品一区二区蜜桃| 深泽县| 狠狠躁天天躁中文字幕无码 | 啦啦啦中文在线视频免费观看| 我的公把我弄高潮了视频| 福利导航大全| 久艹在线| 日韩av日韩| 99蜜桃臀久久久欧美精品网站| 熟女中文字幕在线| 久久18禁| 真人无码国产作爱免费视频| 国产婷婷色综合av蜜臀av| 黑人AV网站| 五月丁香国产在线视频| 欲妇荡岳丰满少妇岳| 久久国产视频精品| 性视频网站入口| 操国产美女| 97超碰人人| 欲妇荡岳丰满少妇岳| 粉嫩av一区二区三区免费| 免费观看全黄做爰大片| 精品淑女少妇av久久免费| 德保县| 丰满人妻一区二区三区|